RL ABTC
14.09.2020

A meeting of the project’s engineering group was held. The development of technical tasks, diagrams of a structural automation system, development of an algorithm for the functioning of the system, development of a draft design of a constructive part of a model of artificial chicken intestine were discussed. The need to prepare a document with a list of performers and individual, as well as group reporting on completed tasks is indicated by the end of the month. Also, the need to draw up an act on the acceptance of finished equipment (testing) was emphasized.